by Mario Apicella

Previews: Early peek at the HP c3000 – Part 1

analysis
Nov 5, 20074 mins

A clear sign of technological obsolescence is the form factor of a product. Disk drives for example have moved from massive packs such as the IBM 3330 (a relic of the mainframe era, if you are too young to remember) to today's one inch drives. Servers is another area where all the size reduction rage is today, and the transition from traditional, individual rack-mounted units to blade systems is already happenin

A clear sign of technological obsolescence is the form factor of a product. Disk drives for example have moved from massive packs such as the IBM 3330 (a relic of the mainframe era, if you are too young to remember) to today’s one inch drives.

Servers is another area where all the size reduction rage is today, and the transition from traditional, individual rack-mounted units to blade systems is already happening.

One of the latest additions to the blade systems space comes from HP with the Proliant c3000 Blade System, a 6U box that, similarly to the SUN Blade 6000, targets small and medium businesses. IBM is also expected to come up with a blade system in that space, if they haven’t already.

I have in my lab a c3000 for evaluation, and after spending some time getting acquainted with it I have realized that there are so many aspects to consider in a blade system that would be difficult to squeeze them all in a single article.

So, I am going to run a few preliminary, ice-breaking pieces, to describe essentially the architecture and the hardware components mounted in my system.

Feel free to let me know if you have questions or suggestions: I’ll certainly answer the questions, and will do my best to accommodate the suggestions. Let’s get started.

Here is Shoooorty!

Why Shorty? Because that’s the nickname the HP folks pinned on the system. With that out of the way, this c3000 hosts 2 servers, an All-in-One storage system with 6 drives, a tape unit, a DVD reader and other components that are not visible in that photo.

Can you recognize all the parts I mentioned in the photo? let me clarify one more thing before we go into more details. One top section on the left and two on the right are empty (and filled with blanks). In that space we could mount more servers and/or more storage.

Compare that to the HP Proliant ML370, for example, a device that occupies 5U, just a notch less than the c3000, with only one server.

The servers mounted on the blade system can connect to external iSCSI or FC storage using connectivity slots that are in the back of the c3000.

You may have noticed that all components beside the DVD have the same size. Those components can also be moved around to a different slot without affecting their functionality, although there are some rules to follow. More on this later.

Can you update a server blade? Removing the cover reveals some of the internal parts of the server, where 2 processors slots and two memory banks are easy to identify. Other circuitry include components such as a video card, NIC etc, but it’s not so easy to discern each of them.

To answer the update question. This server, (its full name by the way is HP Proliant BL465c Server Blade) has room for one more processor and only 2 of its 8 memory slots are filled. However, we can’t mount more than two disk drives.

Curious to know how that works? Very well, but we’ll save that for another chapter. Stay tuned.